Building local capacity in the oil and gas sector

A Major Oil Production Initiative by TotalEnergies, CNOOC, and UNOC

The Tilenga Project, operated by TotalEnergies (56.67%) in partnership with CNOOC (28.33%) and UNOC (15%), aims to produce up to 230,000 barrels of oil per day at peak production. Over a span of at least 20 years, the Tilenga and Kingfisher oil fields are expected to yield approximately 1.4 billion barrels of crude oil. The project involves the development of six fields, with around 400 wells drilled across 31 sites. Read More: https://totalenergies.ug/projects/tilenga-project